Control: Address (Time Setting Address +0)
When the Time Acquisition Request bit's ON (0 to 1) is detected, the Action Mode, Start Day, Start Time, End Day and End Time are read out.

Bit 00: Time Acquisition Request Bit (0: No action, 1: Perform Time Read)
![]()
Data is not read out regularly from the Time Setting Address mode (address +2) to the End Time (Seconds) (address +10). When reflecting Time Settings data changes in the display unit, be sure to turn ON (0 to 1) the Control (address +0) Time Acquisition Request Bit.
Status (Time Setting Address+1)
After the Control time data readout is completed, the display unit will turn the Time Acquisition Completion Bit ON (0 to 1). Also, if the entered time data is incorrect, the Error Notification Bit will simultaneously turn ON (0 to 1).

Bit 00: Time Acquisition Completion Bit (0: Either Time Acquisition is being performed or had not yet been performed, 1: Time Data Acquisition Completed)
Bit 01: Error Notification Bit (0: Time data is being replaced with correct data. 1:Time data contains an error.)
![]()
Once the Time Acquisition Completion bit's rise (trigger) is recognized by the Device/PLC, be sure to turn the control Time Acquisition Request bit OFF (1 to 0).
Once this bit is turned OFF (1 to 0), the Status Time Acquisition Completion bit and the Error Notification bit are simultaneously turned OFF (1 to 0) automatically.
When the [Power-on Start/End Action] is set up, even if the Request Time bit is not ON, gets the time and only the status turns ON. In that condition, if you want to clear the status, you can directly update the status address value.

Action Mode (Time Setting Address+2)
Enable and disable the Termination Time Action and the Individual Day settings. Regardless of the Termination Time Action status, the indirectly designated time data (11 word addresses in the Time Setting Address) are read out.

Bit 00:Termination Time Action Setting (0: None, 1: Used)
Bit 01: Individual Day Specification Mode (0: None, 1: Used)
![]()
If a [0] (Not Used) is entered in the Individual Day Specification mode, the End Time data (day, hour, minute, second) are read but ignored.
If a [1] (Used) is entered in the Individual Day Specification mode, be sure to enter all Start and End time (day, hour, minute, second) information. If 2 or more of the Start/End Day bits turn ON simultaneously, an error occurs.
Start/End Day (Start Day: Time Setting Address +3, End Day: Time Setting Address +7)
Designates the day used as a trigger for the Start/Termination Action.

Bit 00: Sunday (0: None, 1: Used)
Bit 01: Monday (0: None, 1: Used)
Bit 02: Tuesday (0: None, 1: Used)
Bit 03: Wednesday (0: None, 1: Used)
Bit 04: Thursday (0: None, 1: Used)
Bit 05: Friday (0: None, 1: Used)
Bit 06: Saturday (0: None, 1: Used)
Start/End Time: (Start Time: Time Setting Address +4 to +6, End Time: Time Setting Address +8 to +10)
(Start Time: Time Setting Address +4 to +6, End Time: Time Setting Address +8 to +10) Set the time values used for the Start/Termination Actions in the following ranges.
Hour : 0 to 23
Minute : 0 to 59
Second : 0 to 59
![]()
Time data are specified with Bin format. They cannot be specified with BCD format.
Whether to set the End Time depends on the Action Mode (address +2) setting.
Also, the Termination Time Action setting (bit 00) can be configured in the combinations below depending on whether the Individual Day Specification mode (bit 01) is used.
|
Individual Day Specification |
Yes: Used |
X: Not used |
|
|
Termination Time Action Setting |
Yes: Used |
Yes: Used |
X: Not used |