23.4.4.1 Time Setting Address Details

Control: Address (Time Setting Address +0)

When the Time Acquisition Request bit's ON (0 to 1) is detected, the Action Mode, Start Day, Start Time, End Day and End Time are read out.

Bit 00: Time Acquisition Request Bit (0: No action, 1: Perform Time Read)

Status (Time Setting Address+1)

After the Control time data readout is completed, the display unit will turn the Time Acquisition Completion Bit ON (0 to 1). Also, if the entered time data is incorrect, the Error Notification Bit will simultaneously turn ON (0 to 1).

Bit 00: Time Acquisition Completion Bit (0: Either Time Acquisition is being performed or had not yet been performed, 1: Time Data Acquisition Completed)

Bit 01: Error Notification Bit (0: Time data is being replaced with correct data. 1:Time data contains an error.)

Action Mode (Time Setting Address+2)

Enable and disable the Termination Time Action and the Individual Day settings. Regardless of the Termination Time Action status, the indirectly designated time data (11 word addresses in the Time Setting Address) are read out.

Bit 00:Termination Time Action Setting (0: None, 1: Used)

Bit 01: Individual Day Specification Mode (0: None, 1: Used)

Start/End Day (Start Day: Time Setting Address +3, End Day: Time Setting Address +7)

Designates the day used as a trigger for the Start/Termination Action.

Bit 00: Sunday (0: None, 1: Used)

Bit 01: Monday (0: None, 1: Used)

Bit 02: Tuesday (0: None, 1: Used)

Bit 03: Wednesday (0: None, 1: Used)

Bit 04: Thursday (0: None, 1: Used)

Bit 05: Friday (0: None, 1: Used)

Bit 06: Saturday (0: None, 1: Used)

Start/End Time: (Start Time: Time Setting Address +4 to +6, End Time: Time Setting Address +8 to +10)

(Start Time: Time Setting Address +4 to +6, End Time: Time Setting Address +8 to +10) Set the time values used for the Start/Termination Actions in the following ranges.

Hour : 0 to 23

Minute : 0 to 59

Second : 0 to 59