The Schedule trigger runs the operation, at daily basis.
onScheduledDay(0,0,()=>{ 1 2 });
1: Time (hour)
2: Time (minutes)
(Example)
Every day, at 05:09.
onScheduledDay(5,9,()=>{ });
Copyright (C) 2025 Schneider Electric Japan Holdings Ltd. All Rights Reserved. |BLUE 4.1 (Manual Version : 4.1.0.000)| User Guide